中文版 英文版
line
Chock manifold
Choke manifolds
Source: admin  Time2018-11-19
Choke manifolds
Detail Introduction
  
Choke manifolds are used for choking the drilling fluid which is returned from the well. Adjust the choke valve can change throttling degree. Increasing throttling, can make bottom pressure of the well higher than ground pressure,  avoid  ground  liquid  flowing  into  the  well immoderately,   carry out well-kill operation.   Reducing throttling to non- throttling can realize soft closing of the well which can protect the wellhead.
Technical Parameters
Working Pressure:  35~140MPa(5000~20000PSI)
Nominal Diameter: 52~103mm(2 1/16"~4 1/16")
Temperature Level: -46℃~121℃(level L-U)
Specification level: PSL3,PSL3G
Performance level: PR1
Manufacturing Standards:API16C
返回列表
  • Previous:without
  • Next:without
line

Tel: +86 133 5660 2905 Fax: E_mail: mail@greatpetrol.com

返回顶部